NW Groundwork recently invested in some new equipment to assist with road remediation at Frodsham Wind Farm.
The team were delighted to be asked to return to the Natural Power wind farm site to continue remedial work on the site's roadways.
The 9-ton cab dumper truck makes it easier to move the stone required for road building across the site, and means the operator can work in comfort.
The new 1400-wide Hamm roller for bedding in the aggregate increases efficiency with it's wider track and heavier roller.
The team had to clear the vegetaion from the roadways and level the surface before laying down the new aggregate layers and compacting them to make a durable roadway.